Blackfish were brought into a project to assist with a critical fatigue issue on secondary steel-work on a leading wind turbine manufacturer. An expedited solution was a priority for the client, and the team used their skills gained from design and build experience, and worked tirelessly to brainstorm ideas that could develop into workable concepts, before carrying out more analysis to aid with the downselection process, before presenting the concepts to the client. The sucess of this work demonstrates how well the Blackfish team can interact directly with both other consultants, clients and stakeholders at all levels. Due to the sensitivity of the project, we cannot show any images of the actual work that was carried out.